The essentials
- A fixed energy rate does not necessarily fix the entire invoice. Identify every variable, pass-through and adjustment mechanism.
- Match the contract to actual operating hours, demand and site plans. A low headline price can be undermined by volume or exit exposure.
- Retail supply, network connection and financial hedging are distinct arrangements, even when an adviser presents them as one procurement package.
- Business disputes require examination of the contract and applicable protections; do not assume household disconnection rules apply to an industrial account.
Explore this guide 10 sections + FAQs
1. Define what the business is buying
Commercial electricity procurement begins with the sites and activities to be supplied. Identify the legal customer, each installation control point, operating hours, expected usage and planned changes. A small office seeking a straightforward retail plan has different needs from a food processor whose production depends on uninterrupted refrigeration. Write the commercial objective before comparing prices: budget certainty, flexibility, exposure to market prices, renewable procurement or a combination.
Identify all counterparties and agreements. The retailer supplies and bills under its contract; a network operator may have separate connection responsibilities; a broker may act under its own appointment; and a hedge provider may make financial payments without supplying electricity. Ask who is responsible when an interface fails. Our energy law overview explains the broader legal setting, while the contract review should focus on the specific obligations your business is assuming.
| Commercial objective | Contract feature to examine | Question for negotiation |
|---|---|---|
| Predictable expenditure | Fixed and adjustable price components | Which charges can change during the term? |
| Flexible production | Volume bands and excess-use pricing | What happens if demand rises or falls? |
| Continuity of operations | Outage terms, liability and notification | What loss is covered and what remains with us? |
| Ability to relocate | Site removal, assignment and termination | Can the agreement follow the business? |
| Renewable procurement | Generation or certificate commitments | What evidence and attributes are actually transferred? |
2. Break the price into components
Request a complete pricing schedule rather than evaluating only cents per kilowatt-hour. Separate energy, daily or fixed charges, network-related charges, metering, levies, GST and any other identified component. Ask how each item is calculated and whether the contract permits adjustment. The Electricity Authority's bill guidance distinguishes fixed charges from consumption-based costs; for a business, the particular tariff can add further complexity that should be shown explicitly in the quotation.
Compare offers using the same historical consumption and the same assumptions about future operation. Ask the supplier to show an illustrative invoice and identify every charge excluded from its headline estimate. Where a component is described as a pass-through, specify the underlying cost, whether any margin is added, how changes are evidenced and when they take effect. A clause that refers broadly to 'industry costs' deserves closer examination than one tied to a defined published charge.
Check the order of precedence between the signed offer, pricing schedule, standard terms and online documents. Save the versions incorporated when the agreement is made. If a bespoke price promise conflicts with a general variation clause, resolve the conflict in writing before signature. Procurement staff and finance staff should be able to use the same documents to verify the first invoice without relying on the salesperson's memory.
Official resources: Electricity Authority: bill components
3. Understand fixed-price and spot-linked exposure
The Electricity Authority explains that spot-linked contracts expose customers to wholesale price volatility, while fixed-price arrangements allocate some or all of that risk to the supplier. A contract can also combine approaches, such as a fixed rate for a defined volume and a different rate for excess use. The important question is the allocation expressed in the agreement, not whether the marketing material calls the product fixed, flexible or wholesale.
Ask a qualified adviser to test the proposal against adverse conditions, including sustained high prices and short periods when the business cannot reduce consumption. Use the business's actual load profile. An average annual figure can hide expensive exposure during critical production hours. Document who can respond operationally, how quickly a process can be reduced and what that response itself costs. A theoretical ability to switch off is not useful if it would destroy stock or breach customer commitments.
For a hedge or financial contract, identify the reference price, volume, settlement timing, collateral requirements and counterparty exposure. Check whether the hedge and physical supply cover the same periods and quantities. A financial payment does not by itself guarantee delivery to the site. Independent financial and legal advice can address different parts of the arrangement; this guide does not recommend a trading position or predict future electricity prices.
Official resources: Electricity Authority: spot-price contract risks
4. Test demand assumptions and changes to the business
Check any minimum purchase, volume tolerance, maximum demand or forecast obligation. Ask what happens if a major customer leaves, a production line closes or a new electric process starts. A pricing arrangement that works for a stable factory may be unsuitable for a business expecting substantial growth or contraction. Use realistic scenarios rather than simply accepting the previous year's total as a guaranteed future requirement.
For multiple sites, specify how a new site is added and whether one site can be removed without terminating the entire agreement. Check whether pricing depends on the aggregate portfolio, geographic location or particular metering arrangements. If a lease expires before the supply term, examine the consequences of relocation or a gap between premises. A contract may require notice even where the business believes the supplier already knows that the site is closing.
Consider a hypothetical manufacturer that signs a three-year contract and later sells one production facility. The energy agreement may require consent to assignment, recalculation of volume or an exit payment. Those questions should be included in transaction due diligence. Our business law hub covers the wider contractual coordination needed when a business sale or restructuring affects ongoing supply agreements.
5. Allocate outage and operational risks
Read the provisions concerning planned interruptions, network faults, supply restrictions and events beyond a party's control. Identify who must give notice, which events excuse performance and whether there are obligations to mitigate or restore supply. Do not assume an electricity retailer controls every part of the physical network or that a compensation promise covers every interruption. The agreement and the actual cause of the event need to be analysed together.
Compare liability caps and exclusions with the business's plausible losses: damaged stock, missed production, equipment damage and obligations to customers. Ask whether the contract distinguishes direct loss from excluded categories and how that language operates under the governing law. A lawyer can assess enforceability and negotiation options; the business should also review insurance and continuity arrangements with the appropriate advisers. Contractual recovery and practical resilience are separate controls.
Create an operational notification procedure with named roles and current contact details. Record the time of an interruption, affected equipment, steps taken and supporting technical information. Preserve evidence before repairs make the cause difficult to establish, while prioritising safety and necessary mitigation. If more than one provider may be involved, send timely notices without making unsupported allegations about who caused the failure.
Need help with your own situation?
Describe the issue and any important dates. Our introduction service is in early access; an enquiry does not appoint a professional or protect a deadline.
Ask about legal help6. Review PPAs and renewable procurement carefully
A power purchase agreement can connect the customer's payments to output from a generation project, while an on-site arrangement may involve equipment installed at the customer's premises. EECA describes commercial solar purchase and PPA models. The agreement still needs to allocate commissioning risk, generation shortfalls, maintenance, access and the consequences of changes to the site. A long term can support a project but also constrain the customer's future options.
Distinguish the financial arrangement from physical delivery and from any environmental attributes or certificates. Ask exactly what evidence the business may use in its public reporting and whether the relevant attributes are transferred exclusively. Do not promise customers that every unit consumed came directly from a named generator unless the arrangement and evidence support that statement. Have sustainability and legal teams agree the wording before it appears in marketing or disclosures.
For rooftop projects, check the building owner's consent, lease term, roof maintenance and removal obligations alongside the energy contract. Our solar and grid connection guide covers those interfaces. For an off-site or financial PPA, ask what happens if the project is delayed, produces less than forecast or the customer's consumption no longer matches the contracted profile. Avoid treating a renewable label as a substitute for a complete risk allocation.
Official resources: EECA: commercial solar purchasing models · MBIE: power purchase agreement structures
7. Examine credit support and default provisions
Identify security deposits, guarantees, credit review rights and circumstances in which extra security can be required. Ask whether a change in ownership, financial position or payment history allows the supplier to vary terms or terminate. If a director or related company is asked to guarantee obligations, assess that document separately from the supply price. The amount at risk may extend beyond one unpaid invoice.
Read default and cure provisions together. Determine what notice must be given, where it must be sent, what period applies and whether the alleged default can be remedied. Distinguish a disputed invoice from an undisputed overdue amount and check whether the contract addresses that distinction. Do not assume that raising an objection automatically suspends payment or prevents contractual action. Seek a written interim arrangement when continued supply is important.
For a financially stressed business, consider the effect of repayment proposals on ongoing operations and other creditors. A settlement that restores supply but requires unaffordable instalments may only defer the same problem. If a demand threatens termination, enforcement of security or insolvency action, obtain advice promptly and use the debt recovery information hub to understand the separate payment-dispute pathway.
8. Control renewal, variation and exit
Record the start date, end date, notice deadline and any automatic renewal or rollover mechanism. Add reminders well before the contractual notice window. Ask what rate applies after the fixed term if a new agreement has not been signed. A procurement team may negotiate an attractive new offer yet still face charges if the old agreement has not been ended in accordance with its terms.
Examine early termination calculations rather than accepting a general description of an exit fee. Ask for an example using plausible remaining term and volume assumptions, and identify whether the calculation depends on market prices. Check whether termination rights differ after a supplier breach, a customer breach, site closure or a force majeure event. The same outcome should not be assumed for each trigger.
Ensure the person signing has authority and that internal approval includes the liabilities in the standard terms. Keep a final contract register containing all schedules and agreed departures. If a broker negotiates on the business's behalf, clarify its authority, remuneration and whether it can bind the customer. These practical controls help avoid disputes about whether a quotation, email acceptance or signed document created the operative agreement.
9. Respond to a billing or supply dispute with a contract-based account
Build a reconciliation that identifies the invoice, contested component, contractual formula and your alternative calculation. Attach the relevant meter data or price notice and separate accepted charges from disputed ones. For a supply event, prepare a chronology and evidence of cause, mitigation and loss. Ask the counterparty to respond to the specific clause or calculation instead of sending a broad complaint that electricity has become too expensive.
Check the contract's notice and dispute-resolution clauses before sending a formal claim. A routine email to an account manager may not satisfy a contractual notice requirement. Follow any applicable escalation, expert determination, mediation or arbitration process while preserving urgent rights. Obtain advice where a limitation period, termination notice or serious operational risk is involved; informal negotiations do not necessarily stop a legal clock.
Utilities Disputes may be relevant to an eligible business complaint, but coverage should be confirmed under its rules rather than assumed. Regulatory reports and contractual remedies have different purposes. For a straightforward reconciliation, our electricity billing disputes guide supplies a useful evidence structure; the business contract remains central to questions about volume, pass-through charges and termination.
Official resources: Utilities Disputes: scheme eligibility · Commerce Commission: electricity contracts and regulatory roles
10. Prepare a focused legal and commercial review
Give the adviser the full proposed agreement, existing contract, twelve months of useful consumption information if available, planned site changes and the supplier's financial model. Identify the commercial decisions that matter most: maximum acceptable price exposure, ability to relocate, operational continuity and exit flexibility. Ask for the important risks to be ranked by consequence and negotiability rather than receiving a list of every conceivable drafting point.
A practical review should produce an issues schedule with the clause, business consequence, proposed change and fallback position. Technical questions about metering or network design should go to the relevant specialist. Financial assumptions should be tested by someone competent to assess them. Legal review then connects those inputs to enforceable obligations and the choices the business can actually make.
After agreement, turn negotiated protections into operating tasks: notice reminders, invoice checks, volume monitoring and an escalation contact list. A favourable clause has limited value if nobody notices the event that activates it. Revisit the arrangement when production, property occupation or ownership changes, and keep a record of approved amendments so the commercial team does not continue managing an obsolete version.
- Supply the complete contract and every incorporated schedule.
- Describe future operational changes, not only historic usage.
- Request quantified examples for adjustment and exit formulas.
- Assign responsibility for notices, invoice review and contract renewal.
Frequently asked questions
Does a fixed-price contract mean every part of the bill stays unchanged?+
Only if the agreement provides that result. A fixed energy rate may sit alongside adjustable network, metering or other components. Ask the supplier to identify every variation mechanism and provide an example invoice. Resolve any inconsistency between a bespoke offer and standard terms before signing.
Is buying at spot prices always cheaper for a business?+
No outcome is guaranteed. Spot-linked procurement exposes the customer to price changes that can be severe or sustained. Compare scenarios using the business's actual load and ability to reduce consumption, and obtain suitable independent advice. An apparent average saving does not establish that the business can absorb an adverse period.
Can we leave the agreement when our lease ends?+
Check the site-removal, relocation, assignment and termination provisions. A lease ending does not necessarily end a separate electricity commitment. Align the terms during negotiation and ask how exit charges would be calculated if the business moves earlier than expected or transfers the premises to a buyer.
Will the retailer compensate us for all losses from a power cut?+
That depends on the cause, contract, applicable law and evidence. Examine liability limits, excluded losses, notification duties and the roles of the retailer and network operator. Preserve technical records and loss evidence, while taking reasonable steps to reduce harm. Review insurance and continuity planning separately from the legal claim.
Does a financial hedge guarantee electricity supply?+
A financial hedge can create payments linked to a reference price without physically supplying the premises. It must be considered alongside the retail and network arrangements. Check matching volumes and periods, settlement terms, collateral and counterparty risk with appropriately qualified advisers.
Can residential disconnection protections be used for our factory account?+
Do not assume household Consumer Care Obligations automatically govern an industrial or commercial arrangement. The customer category, relevant rules and contract need to be checked. If supply is threatened, raise the operational urgency immediately and seek a written arrangement while obtaining advice on the specific account.
Can Utilities Disputes handle a business electricity complaint?+
It may be able to assist where the complaint and parties fall within its scheme rules. Confirm eligibility directly and provide the contract, complaint history and disputed amounts. A complex procurement or financial-contract dispute may require a different process, particularly where an agreement provides for expert determination or arbitration.
What should we ask a lawyer to prioritise before signature?+
Prioritise the risks that could materially affect the business: price adjustment, volume exposure, security, liability, site changes and exit. Provide operational assumptions and ask for proposed amendments with fallback positions. A clear commercial brief helps the lawyer distinguish an unacceptable risk from a point the business can manage.