The essentials

  • Read the notice type, recipient, affected activity and deadline before deciding how to respond.
  • An improvement notice, prohibition notice and non-disturbance notice perform different functions.
  • Requesting review does not automatically suspend an inspector's notice; address a stay expressly.
  • The internal-review time limit for an improvement notice can be shorter than 14 days.
  • Keep safety action, evidence preservation and legal challenge coordinated, with clear authority to restart work.
Explore this guide 12 sections + FAQs

Start with the document and the actual activity

Obtain a complete copy of the notice, including attachments, photographs and any covering email. Record when it first came to the affected person's attention and how it was delivered. Identify the legal entity named, the inspector, the workplace, the activity and the requirement. A notice addressed to a company should not disappear into an individual supervisor's inbox.

Read mandatory directions separately from explanatory material or recommendations. Summarise the requirement in plain language for the people doing the work, but retain the original wording for legal assessment. If the notice refers to one machine, process or part of a site, establish its precise scope rather than assuming it either closes everything or affects only a trivial detail.

This guide reflects the position on 21 November 2026. The enacted 2026 health and safety amendments are scheduled to commence on 1 April 2027. Health and safety legal advice can assess a notice against the law applying to the relevant decision and activity; future reform is not a basis for ignoring a current requirement.

Official resources: WorkSafe: forthcoming legislative changes

Improvement, prohibition and non-disturbance notices

An improvement notice addresses a contravention that the inspector considers is occurring, or has occurred and is likely to continue or recur. It specifies a compliance period. The practical response normally needs to identify the required outcome, select an effective remedy and assemble evidence that the remedy has been implemented within the permitted period.

A prohibition notice concerns a serious-risk situation within the statutory criteria and can require an activity to stop, or stop being carried on in a specified way. A non-disturbance notice instead protects a site or relevant things for regulatory purposes. Preserving equipment for examination and stopping unsafe use are different instructions, even when both arise from the same event.

Do not confuse these notices with an infringement notice, prosecution, or a health and safety representative's provisional improvement notice. They have different legal effects and challenge procedures. File the actual document under its correct name and use the instructions and statutory route applicable to that instrument.

Improvement, prohibition and non-disturbance notices
InstrumentMain purposeImmediate focus
Improvement noticeAddress an identified contraventionRequired remedy and compliance date
Prohibition noticeStop activity involving the specified serious riskStop the affected activity and establish restart conditions
Non-disturbance noticePreserve a site or things for regulatory workAccess controls and permitted disturbance
Provisional improvement noticeHSR process for a workplace concernSeparate statutory review procedure
Infringement noticeAlleged prescribed offence and fee processPayment or challenge instructions, not an improvement plan

Official resources: WorkSafe: introduction to HSWA

Turning an improvement notice into a workable plan

Break the requirement into tasks with owners, dependencies and evidence. A machinery issue may require engineering design, procurement, installation, testing and worker instruction. A hazardous-substance issue may involve storage changes, emergency arrangements and information for people exposed. A general promise to “update the policy” may leave the actual risk untouched.

Check whether the proposed solution achieves the legal requirement and suits the work in practice. If the notice describes an outcome rather than one mandatory technical design, a competent specialist can help compare options. Keep a record of the reasoning, assumptions and verification. Where an aspect is unclear, ask the inspector a specific question supported by a drawing or description.

An extension request should explain why more time is needed, what has already been done, what temporary controls apply and a realistic completion programme. Ask before the existing period expires and obtain the actual decision. A supplier's delay or unanswered request is not itself an extension. Continue to manage risk while the timing question is resolved.

Official resources: WorkSafe: internal review of a reviewable decision

Prohibition notices and authority to restart

Under section 105, an inspector can direct that a matter or activity stop, or stop in a specified way, until an inspector is satisfied that the relevant risk has been remedied. An oral direction may precede the written notice. Do not assume there is no obligation until an emailed document arrives if a lawful direction has already been given.

Immediately communicate the restriction to everyone who could restart the activity, including contractors, maintenance teams and later shifts. Isolate equipment where appropriate and provide alternative arrangements that do not reproduce the prohibited risk elsewhere. A manager's commercial urgency or a customer's deadline does not supply authority to disregard the direction.

Prepare a restart package showing the remedy, specialist verification, photographs, test results and revised operating arrangements as relevant. Agree how the inspector will assess it and retain the resulting confirmation. Avoid ambiguous messages such as “looks better” being treated as permission for unrestricted operation. The scope of any permission should match the work that is actually proposed.

Official resources: Health and Safety at Work Act: section 105 prohibition notices

Non-disturbance notices and evidence protection

A non-disturbance notice can require preservation of a site or prevent interference with particular things while the regulator exercises compliance powers. Make the boundary understandable: which area, machine, component or records are affected, who controls access and which activities would change the condition being preserved.

There are statutory exceptions for specified actions such as helping injured people and essential safety measures. Apply those exceptions to actual necessity rather than convenience, and document changes. Seek permission for proposed inspections, removal, testing or repairs where the notice or preservation duty requires it. Destructive testing can permanently alter evidence and needs careful agreement.

The preservation duty following a notifiable event can exist even without a separate non-disturbance notice. Read notifiable workplace incidents alongside the notice. Do not treat the end of one document's specified period as automatic clearance of every other restriction or unresolved hazard at the site.

Official resources: WorkSafe: introduction to HSWA

Internal review: eligibility, deadlines and the application

Section 131 allows an eligible person to apply for internal review of a reviewable decision. For a decision issuing an improvement notice, the specified time is the compliance period or 14 days, whichever is shorter. For other reviewable decisions it is generally 14 days, calculated under the section from when the decision first came to the person's notice. The regulator can allow a longer period, but that discretion should not be assumed.

Check that the applicant is the affected person or authorised representative and that the decision falls within the statutory definition. Use the required form and supply the notice, reasons, supporting evidence and the precise outcome sought. A review request should explain why the decision should change, not merely express frustration with an inspection.

Useful grounds may concern the factual basis, the legal requirement relied on, the scope of the direction or evidence relevant to the proposed remedy. Identify each issue separately. If the compliance date is very close, make the deadline assessment immediately rather than spending the available time compiling a lengthy narrative. Confirm receipt and keep proof of submission.

Official resources: Health and Safety at Work Act: section 131 internal review · WorkSafe: internal review application form

Need help with your own situation?

Describe the issue and any important dates. Our introduction service is in early access; an enquiry does not appoint a professional or protect a deadline.

Ask about legal help

Review, clarification and a stay are separate questions

Do not assume that applying for internal review suspends an inspector's notice. The statutory review framework provides for a stay decision, and WorkSafe's application form asks whether a stay is sought. Address that request expressly where necessary and obtain the decision before acting as though the notice has ceased to operate.

Explain why the requested stay is appropriate and what safety arrangements would apply in the meantime. A request based only on lost production leaves the central risk question unanswered. Depending on the facts, a narrower operational proposal or revised compliance requirement may be more useful than seeking unrestricted continuation of the previous practice.

Asking an inspector to clarify wording is also different from lodging a formal review. A courteous discussion may resolve a misunderstanding, but it should not silently consume the review period. Keep a written note of what was clarified and whether the original decision was formally varied. Where there is a District Court appeal route, obtain advice about eligibility, timing and any separate stay requirement.

Official resources: WorkSafe: internal review application form · Health and Safety at Work Act: reviews and appeals

A provisional improvement notice follows a distinct route

A provisional improvement notice is issued through the health and safety representative framework, rather than being the same instrument as an inspector's improvement notice. Verify the issuer, the concern, the notice's requirements and the applicable provisions. Treat the concern seriously while checking the legal process; dismissing it because it came from a worker representative can allow the underlying problem to worsen.

Section 79 provides a seven-day period after issue for specified persons to request an inspector's review of a provisional improvement notice. A request under that section stays the provisional notice until the inspector decides the review. That specific rule should not be imported into the different section 131 process for reviewing an inspector's decision.

Maintain respectful worker engagement throughout. A disagreement about a notice is not a reason to discourage legitimate reporting or retaliate against a representative. Separate any genuine employment issue from the safety concern and obtain employment law advice where those processes overlap. Keep the technical evidence and consultation record available to whoever reviews the matter.

Official resources: Health and Safety at Work Act: section 79 provisional improvement notice review

Evidence, technical specialists and shared duties

Build a concise evidence bundle around the disputed or remedied issue. Include the notice, a chronology, relevant photographs, operating instructions, risk assessments, maintenance and inspection records, and the specialist opinion relied on. Explain what each item proves. Hundreds of unindexed documents can obscure a strong point and increase review costs.

The technical specialist should address the actual equipment or activity, the observed risk, the proposed control and any limits of their assessment. A certificate from a different site or an inspection conducted before a major modification may not answer the current concern. Legal advice can then address whether the evidence meets the statutory question and how the response should be framed.

At a shared workplace, clarify who can implement each measure. A landlord, host and contractor may control different parts of the solution. Overlapping safety duties require practical coordination; sending the notice to another business does not establish that your own responsibilities have ended. Record agreements, completion evidence and unresolved interfaces.

Costs, insurance and commercial consequences

The cost of responding depends on the technical issue, urgency, number of affected sites and whether the facts or legal basis are disputed. Ask for separate estimates for immediate assessment, technical work, review submissions and any court process. Identify assumptions and a point at which the adviser will report back before costs materially increase.

Check supply contracts, leases and project programmes for notification obligations and knock-on effects. Tell commercial counterparties what can be said accurately about delays and proposed mitigation without promising a restart date you do not control. Keep records of additional costs and the steps taken to reduce avoidable loss; their later recoverability is a separate contractual question.

Discuss relevant policy notifications with the insurer and obtain insurance advice if defence arrangements or cover are uncertain. Do not assume every regulatory cost or consequence is insured. Budget also for implementing the remedy, training, independent verification and monitoring, which may be more significant operationally than drafting the review request.

Hypothetical example: guarding on a production line

An inspector issues an improvement notice concerning access to moving machinery. The business believes the inspection misunderstood an existing interlock. Its engineer finds that the interlock works in normal mode but can be bypassed during cleaning. The initial dispute therefore contains both a factual clarification and a real control issue.

The business records the notice date, checks the shorter review deadline and immediately changes the cleaning arrangement to prevent exposure. It supplies the inspector with the engineer's findings and a proposed permanent solution. If it requests review, it identifies precisely which part of the notice it challenges and what revised requirement it seeks, rather than denying that any risk exists.

Procurement will take longer than the current compliance period, so the business separately requests an extension supported by interim controls and a confirmed installation schedule. It does not treat that request as granted until a decision is received. After installation, testing and worker instruction provide evidence of completion. This example illustrates why legal process and practical risk control need to proceed together.

Closing the notice without losing the lesson

Maintain a response register showing the notice, statutory and operational dates, responsible person, correspondence, action evidence and any variation, stay or closure confirmation. Ensure another manager can understand the file without relying on the original recipient's memory. Calendar follow-up dates as well as formal deadlines.

Completion should include checking the same issue elsewhere. A repaired guard on one line may reveal similar exposure on another; a corrected isolation procedure may need to be adopted by maintenance contractors too. Record the scope of the review and why other equipment or sites do or do not require action.

Finally, update the ongoing system in a proportionate way. The useful lesson is the control that failed, the information that was missing or the coordination that did not occur. A longer policy alone may not improve the work. For arrangements extending into April 2027, schedule a review against the commenced amendments and current guidance without prematurely relaxing today's obligations.

  • Record the actual notice and the date it came to attention.
  • Separate compliance, review, extension and stay questions.
  • Give operational staff clear restrictions and named decision-makers.
  • Submit evidence that addresses the precise legal and technical issue.
  • Retain the decision and verify the remedy during real work.

Official resources: WorkSafe: forthcoming legislative changes

Frequently asked questions

Can we keep working while asking WorkSafe to review a notice?+

Not merely because a review was requested. Establish the notice's actual restrictions and whether a stay or variation has been granted. An inspector's prohibition direction remains a serious operational constraint; obtain clear authority before restarting affected work.

Is the review deadline always 14 days?+

No. For an improvement notice, section 131 uses the compliance period or 14 days, whichever is shorter. Other reviewable decisions generally use 14 days under that provision. A provisional improvement notice has a different review process and period.

Can WorkSafe extend an improvement notice deadline?+

The legislation provides for decisions about extending the compliance period. Apply promptly with a reasoned programme and interim controls. A request, supplier delay or informal discussion does not itself change the deadline; retain the actual decision.

Does correcting the problem mean the notice was legally justified?+

Taking sensible safety action does not by itself resolve every dispute about the original notice. Record the reason for the action and obtain advice about any challenge. Equally, disputing the notice does not excuse leaving an identified risk unmanaged.

Is a non-disturbance notice a finding that the business broke the law?+

It is a preservation tool used for regulatory purposes, not itself a final finding of liability. Comply with its scope and permitted exceptions while preserving evidence that may explain what happened.

Does a small error in the notice make it invalid?+

Do not assume so. The statutory framework addresses formal defects, and their significance depends on the issue and prejudice involved. Identify the practical uncertainty, seek clarification and get advice on any substantive challenge while observing applicable requirements.

Can a contractor handle the response for the site owner?+

A contractor may undertake agreed tasks, but the relevant recipient and businesses need to understand their own obligations and control. Confirm authority, evidence and communication arrangements rather than simply forwarding the notice and closing the file.

Do the 2026 amendments already change how we respond?+

As at 21 November 2026, official guidance states that the enacted changes commence on 1 April 2027. Apply the law in force to the relevant decision and check transitional provisions for later work. Do not rely on future reforms to disregard a present notice.

Official sources & further reading

  1. WorkSafe: internal review of a reviewable decision
  2. Health and Safety at Work Act: section 131 internal review
  3. Health and Safety at Work Act: section 105 prohibition notices
  4. WorkSafe: introduction to HSWA
  5. WorkSafe: internal review application form
  6. Health and Safety at Work Act: section 79 provisional improvement notice review
  7. WorkSafe: forthcoming legislative changes
  8. Health and Safety at Work Act: reviews and appeals
Updated 21 November 2026. This is general information, not advice about your circumstances. It has not been independently reviewed by a lawyer. Check current official information and obtain advice before relying on a deadline or taking a consequential step.